Equipamiento eléctrico y electromecánico de las estaciones del proyecto: “Ampliación y mejoramiento de los sistemas de agua potable y alcantarillado del esquema San Pedro de Carabayllo- Lima

dc.contributor.advisorChávez Espinoza, José Armando
dc.contributor.authorMedrano Bobadilla, Carlos Augusto
dc.date.accessioned2025-09-18T13:59:16Z
dc.date.available2025-09-18T13:59:16Z
dc.date.issued2024
dc.description.abstractEl trabajo de suficiencia profesional que se presenta tiene como objetivo describir el Equipamiento eléctrico y electromecánico de las estaciones del proyecto: “Ampliación y mejoramiento de los sistemas de agua potable y alcantarillado del esquema San Pedro de Carabayllo- Lima”. Los reservorios están ubicados en el distrito de Carabayllo, provincia y región de Lima y son de propiedad de la empresa Servicio de Agua Potable y Alcantarillado de Lima, SEDAPAL. El equipamiento utilizado para este trabajo fueron electrobombas tipo turbina vertical, tableros eléctrico general, tablero eléctrico de electrobomba, tablero eléctrico de banco de condensador, tablero de distribucion, cables eléctricos, transformador de potencia y sistemas de puesta a tierra. Se utilizó el cálculo de la potencia absorbida de la bomba para obtener la potencia del motor eléctrico, la máxima demanda para obtener las potencias a contratar con la concesionaria eléctrica, la potencia del transformador eléctrico; las protecciones termomagnéticas, contactores, condensadores y arrancadores de estado sólido para los tableros eléctricos, la caída de tensión de los cables eléctricos instalados y la resistencia de las puestas a tierra instaladas. Los resultados obtenidos fueron el suministro e instalación de 02 equipos de bombeo de 125 HP que se instalaron en la estación R-01 (Reservorio Mejorado N°1) y que impulsan agua a la estación RP-2 (Reservorio Mejorado N°2), estos equipos operan con un caudal de 75 l/s y una altura dinámica total de 77 mca. Se determinó la máxima demanda eléctrica de 120 kW para la estación RP-1 y de 4.00 kW para la estación RP-2, de acuerdo a esta máxima demanda se logró realizar las coordinaciones con la concesionaria eléctrica para la dotación de suministro eléctrico de las referidas estaciones. Se seleccionó el interruptor termomagnético trifásico de 250A para el tablero general principal, el interruptor termomagnético trifásico de 250A para el tablero general, el interruptor termomagnético trifásico de 200A, el contactor de línea y bypass trifásico de 225A y el arrancador de estado sólido de 203A para los tableros de electrobomba TF-B1 y TF-B2, se seleccionaron los condensadores de 29 kVAR y 10.5 kVAR para los tableros de banco de condensadores. Se seleccionaron cables eléctricos de tipo N2XOH y NHX-90 trifásico de diámetros 120, 95, 70, 16 y 4 mm2 para la conexión entre tableros eléctricos y electrobombas. Finalmente, se obtuvo un resultado de 12.12 Ohm para el sistema de puesta a tierra para baja tensión y de 4.04 Ohm para sistema de puesta a tierra de control. Teniendo como conclusión el llevar agua potable del reservorio mejorado R-01 hacia el reservorio ejecutado RP-02 y también dotar del servicio de agua potable y alcantarillado a 647 conexiones domiciliarias, favoreciendo y mejorando la calidad de vida de la población beneficiada.
dc.description.abstractThe objective of the professional proficiency work presented is to describe the electrical and electromechanical equipment of the project stations: “Expansion and improvement of the drinking water and sewage systems of the San Pedro de Carabayllo-Lima scheme.” The reservoirs are located in the district of Carabayllo, province and region of Lima and are owned by the company Servicio de Agua Potable y Alcantarillado de Lima, SEDAPAL. The equipment used for this work was vertical turbine type electric pumps, general electrical panels, electric pump electrical panel, capacitor bank electrical panel, distribution panel, electrical cables, power transformer and grounding systems. The calculation of the absorbed power of the pump was used to obtain the power of the electric motor, the maximum demand to obtain the powers to be contracted with the electrical concessionaire, the power of the electrical transformer; thermomagnetic protections, contactors, capacitors and solid state starters for electrical panels, the voltage drop of the installed electrical cables and the resistance of the installed grounding. The results obtained were the supply and installation of 02 125 HP pumping equipment that was installed at station R-01 (Improved Reservoir No. 1) and that pumps water to station RP-2 (Improved Reservoir No. 2), These devices operate with a flow rate of 75 l/s and a total dynamic head of 77 mca. The maximum electrical demand of 120 kW for station RP-1 and 4.00 kW for station RP-2 was determined. According to this maximum demand, coordination was carried out with the electrical concessionaire for the provision of electrical supply to the aforementioned stations. seasons. The 250A three-phase thermomagnetic switch was selected for the main general panel, the 250A three-phase thermomagnetic switch for the main panel, the 200A three-phase thermomagnetic switch, the 225A three-phase line and bypass contactor and the 203A solid state starter for the TF-B1 and TF-B2 electric pump boards, 29 kVAR and 10.5 kVAR capacitors were selected for the capacitor bank boards. Three-phase N2XOH and NHX-90 type electrical cables with diameters of 120, 95, 70, 16 and 4 mm2 were selected for the connection between electrical panels and electric pumps. Finally, a result of 12.12 Ohm was obtained for the low voltage grounding system and 4.04 Ohm for the control grounding system. The conclusion is to bring drinking water from the improved R-01 reservoir to the executed RP 02 reservoir and also provide drinking water and sewage service to 647 home connections, favoring and improving the quality of life of the benefited population.
dc.formatapplication/pdf
dc.identifier.urihttps://hdl.handle.net/20.500.13028/6641
dc.language.isospa
dc.publisherUniversidad Nacional San Luis Gonzaga
dc.publisher.countryPE
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/
dc.subjectIngeniería hidráulica
dc.subjectTransformadores eléctricos
dc.subjectDiseño y construcción
dc.subjectConductores eléctricos
dc.subjectInstalaciones eléctricas
dc.subjectMantenimiento y reparación
dc.subjectIngeniería eléctrica.
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.02.00
dc.titleEquipamiento eléctrico y electromecánico de las estaciones del proyecto: “Ampliación y mejoramiento de los sistemas de agua potable y alcantarillado del esquema San Pedro de Carabayllo- Lima
dc.typeinfo:eu-repo/semantics/bachelorThesis
dc.type.versioninfo:eu-repo/semantics/publishedVersion
renati.advisor.dni21411112
renati.advisor.orcidhttps://orcid.org/0000-0002-2465-3474
renati.author.dni71450679
renati.discipline713076
renati.jurorRodríguez Chacón, José Carlos
renati.jurorTello Mego, Hernán Darío
renati.jurorGonzales Allauja, Percy Abel
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesional
renati.typehttp://purl.org/pe-repo/renati/type#tesis
thesis.degree.disciplineIngeniería Mecánica Eléctrica
thesis.degree.grantorUniversidad Nacional San Luis Gonzaga. Facultad de Ingeniería Mecánica Eléctrica y Electrónica
thesis.degree.nameIngeniero Mecánico Eléctrico

Archivos

Bloque original

Mostrando 1 - 3 de 3
No hay miniatura disponible
Nombre:
EQUIPA~1.PDF
Tamaño:
6.26 MB
Formato:
Adobe Portable Document Format
No hay miniatura disponible
Nombre:
ANTIPLAGIO.pdf
Tamaño:
521.99 KB
Formato:
Adobe Portable Document Format
No hay miniatura disponible
Nombre:
Formato de autorización.pdf
Tamaño:
193.57 KB
Formato:
Adobe Portable Document Format

Bloque de licencias

Mostrando 1 - 1 de 1
No hay miniatura disponible
Nombre:
license.txt
Tamaño:
1.27 KB
Formato:
Item-specific license agreed upon to submission
Descripción:

Colecciones